PSS has provided turnkey projects for new UPS systems and upgrade of existing UPS systems. Need to change out a battery system? Power Systems Specialists can provide a complete turnkey package with the batteries, racks, spill containment and installation and commissioning. Backup generators systems are no problem, we have done both stand alone units and have integrated new units into existing parallel systems.
Many customers find that they need to install a new system but they do not have the manpower available to manage the project and to hire all of the subcontractors for the project. Power Systems Specialists can help. Whether it is a big or small project, we can provide project management and turnkey services. This allows the customer to get a state of the art system that is reliable without all of the day to day problems of doing the project management in house. Our customers are able to concentrate on what they do best, while we take care of installing and upgrading their power systems. Power Systems Specialists can work hand in hand with your preferred vendors that you have previously worked with.
A partial list of different types of turnkeys that Power Systems Specialists has performed in the past couple of years: |
| UPS System Upgrades |
Supplied and deliver two 500kVA UPS modules
Scope of work included; installation of one 500kVA module to each of the existing parallel system of three 500kVA modules for System A and System B, battery rundown and system testing. (Critical load was transferred to diesel maintenance bypass for final parallel testing, no outages to data center).
Supply and install two 60kW APC Silcon UPS systems with parallel bypass switchboard.Scope of work included; removal of existing system, electrical installation, complete testing of new system, battery rundown and full load generator testing prior to disconnecting existing UPS system.
|
| Back Up Generators |
Supplied and installed mufflers for two 1,250 kW diesel generators, upgraded the engine controls and performed mechanical upgrades. See our gallery of project photos.
Supplied 150kW diesel generator, 600 Amp ATS, UPS maintenance bypass switchboard, diesel maintenance bypass switchboard.Scope of work included; building an addition adjacent to the UPS room for the new switchgear, delivering and placement of equipment using crane and electrical installation.
Supplied and installed 75kW standby generator and ATS for cell tower site.(Site located on top of a mountain in Northern Virginia). |
| Battery Systems |
| Remove 240 jars of C&D C&D XT1LC-27 wet cell batteries, supply and install new battery system consisting of 60 Jars of C&D XT4LC13 batteries. |
| System was completed in 2 days while the UPS plant was operating on standby generator, no outages to data center. |
| Supplied, removed and installed two VRLA battery system for two 600kVA UPS System. |
| PSS removed 60 jars of Exide 4DZ-17 wet cell batteries, supply and install one new battery system consisted of 240 jars of C&D LS2-600 VRLA batteries for each system. |
| Supplied, removed and installed two VRLA battery systems for two for parallel 600kVA UPS System. |
| 244 jars of C&D LS2-600 VRLA battery system |
| Supplied, remove and install two VRLA battery systems for two 500kVA UPS systems. |
| New battery system consisted of 486 jars (two strings of 243 cells each) of C&D Dynasty series UPS6-620 VRLA batteries. |
|
|